S-2.1, r. 14 - Regulation respecting occupational health and safety in mines

Full text
124. The evacuation drill prescribed by section 123 shall be the subject of a report containing the following information:
(1)  the date of the drill;
(2)  the times of the beginning and end of the shift during which the alarm system was activated;
(3)  the exact time at which the alert was given;
(4)  the name and title of the person who gave the alert;
(5)  the place from which the alert was given;
(6)  the name and position of the person who activated the alarm system;
(7)  the exact time at which the alarm system was activated;
(8)  the exact time and place at which the last worker was located;
(9)  the number of workers who were underground;
(10)  where applicable, the work place of each worker not alerted by the alarm system.
The report must be forwarded to the mine’s health and safety committee, the Commission des normes, de l’équité, de la santé et de la sécurité du travail and the mine rescue department.
O.C. 213-93, s. 124; O.C. 42-2004, s. 6.
124. The evacuation drill prescribed by section 123 shall be the subject of a report containing the following information:
(1)  the date of the drill;
(2)  the times of the beginning and end of the shift during which the alarm system was activated;
(3)  the exact time at which the alert was given;
(4)  the name and title of the person who gave the alert;
(5)  the place from which the alert was given;
(6)  the name and position of the person who activated the alarm system;
(7)  the exact time at which the alarm system was activated;
(8)  the exact time and place at which the last worker was located;
(9)  the number of workers who were underground;
(10)  where applicable, the work place of each worker not alerted by the alarm system.
The report must be forwarded to the mine’s health and safety committee, the Commission de la santé et de la sécurité du travail and the mine rescue department.
O.C. 213-93, s. 124; O.C. 42-2004, s. 6.